BLACK mobile logo

michigan

politics

What to know before walking across the Gordie Howe Bridge

August 6, 2026

The Gordie Howe International Bridge has opened its two-lane pedestrian and cycling pathway connecting the United States and Canada, following the bridge's official opening on July 27 after tariff-related delays. The approximately 1. 8-mile elevated path accommodates walkers and cyclists on a shared 12-foot-wide lane, with the crossing taking roughly 45 minutes on foot or 20 minutes by bicycle.

Who is affected

  • Pedestrians, runners, and cyclists traveling between the United States and Canada
  • Residents of Detroit and surrounding areas on the American side
  • Canadians seeking to cross the border on foot or by bicycle
  • People using mobility devices (motorized wheelchairs and scooters)
  • Service animal handlers

What action is being taken

  • The pedestrian path is now operating and allowing crossings between countries
  • Officials are encouraging pedestrians to delay their crossings until later in summer
  • Bridge authorities are limiting access during the first few days with first-come, first-served entry
  • Border inspection is being conducted separately for pedestrians from vehicle traffic

Why it matters

  • This pedestrian pathway provides a unique direct non-motorized transportation link between two countries, offering recreational and practical travel options for people without vehicles. The bridge creates an accessible international crossing option that doesn't require automobile transportation, expanding mobility for pedestrians and cyclists in the Detroit-Windsor corridor. The opening represents a significant infrastructure achievement despite being delayed by international trade tensions and tariff disputes between the United States and Canada.

What's next

  • No explicit next steps stated in the article

Read full article from source: bridgedetroit.com